PERAMALAN DATA PELANGGAN BARU PDAM KABUPATEN PURBALINGGA MENGGUNAKAN METODE ARIMA

Pitaloka, Anggita Dyah (2018) PERAMALAN DATA PELANGGAN BARU PDAM KABUPATEN PURBALINGGA MENGGUNAKAN METODE ARIMA. Other thesis, STMIK Amikom Purwokerto.

[thumbnail of COVER.pdf]
Preview
Text
COVER.pdf

Download (590kB) | Preview
[thumbnail of DAFTAR ISI.pdf]
Preview
Text
DAFTAR ISI.pdf

Download (306kB) | Preview
[thumbnail of ABSTRAK.pdf]
Preview
Text
ABSTRAK.pdf

Download (314kB) | Preview
[thumbnail of BAB I.pdf] Image
BAB I.pdf
Restricted to Registered users only

Download (341kB)
[thumbnail of BAB II.pdf] Image
BAB II.pdf
Restricted to Registered users only

Download (486kB)
[thumbnail of BAB III.pdf] Image
BAB III.pdf
Restricted to Registered users only

Download (363kB)
[thumbnail of BAB IV.pdf] Image
BAB IV.pdf
Restricted to Registered users only

Download (443kB)
[thumbnail of BAB V.pdf] Image
BAB V.pdf
Restricted to Registered users only

Download (310kB)
[thumbnail of DAFTAR PUSTAKA.pdf] Image
DAFTAR PUSTAKA.pdf
Restricted to Registered users only

Download (315kB)
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Repository staff only

Download (668kB)

Abstract

Normally, people get the clean water from PDAM in every area. With increase people year by year, the clean water also increase for the people. This thing also influence for the clean water service like PDAM Purbalingga , so they get a new customer. A new customer who increase in every year will add cost for the company. This thing make me interested for doing next research. This research use ARIMA method. The data we use is the customer data PDAM Purbalingga 2014-2016 for predict the next customer data in 2017-2019. Process for this method is identify problem, collect data, stasionery data, temporary identify model, estimate parameter for the model and applicate model that we choose and for the next step we use MAPE (Mean Absolute Percentage Error) calculate for verification model. The calculate result that we do, we got 0,02% MAPE point, with accurate prediction 99,98%. From that result, we can got the conclusion if ARIMA method is the best solution for predict a customer data in order to PDAM Purbalingga could make a cost for product a clean water.
Item Type: Thesis (Other)
Additional Information: Dosen Pembimbing: Hendra Marcos, S. T., M.Eng.
Uncontrolled Keywords: Cost, Predict, ARIMA
Subjects: T Technology > T Technology (General)
Divisions: Fakultas Ilmu Komputer > Sistem Informasi
Depositing User: UPT Perpustakaan Pusat Universitas Amikom Purwokerto
Date Deposited: 12 Mar 2021 04:20
Last Modified: 12 Mar 2021 04:20
URI: https://eprints.amikompurwokerto.ac.id/id/eprint/657

Actions (login required)

View Item
View Item